Wednesday, April 7, 2010

It`s totally tired when one whole day being burn under sunny wheather...
My job today was to take reading no of blows of piling process...
Now, I know already how to take and count no of blows of the piles...
Moreover I know how to read no of holes by looking into the plan and determine which hole should be piled...
I also had learn new thing for such how the pile is joint between 1 pile to another by knowing what method they are using and what kind of materials are used...
Besides that, the site officer also ask me to count the L-shape rc concrete for him to make sure that which sizes should be ordered...
There are different sizes of L-shape for the drain according to the plan that design by the consultant...
The different sizes are to make sure the drain have slope to ensure the water will flow smoothly...
By looking roughly into it, you would not see the differences depth...but from the plan, you can see which length should have big sizes or small sizes...